On average, it takes at least 3 to 4 weeks for bathroom remodeling. However, for larger remodels, the expected time frame is around 4 to 6 weeks. Nonetheless, it would take at least a couple of months to remodel a bathroom from scratch. And that too, depends on various factors.
Factors that affect the bathroom remodel timeline
Bathroom remodeling projects are one of the most fun and versatile tasks with no set timeline of completion. Therefore, understanding some factors and planning the project effectively may help to achieve the results on time.
Scope of remodel
The real answer to, “How long does a bathroom remodel take” lies in the scope of bathroom remodel. The total timeline usually depends on the extent of the remodel. For example, if you want to do simple cosmetic upgrades or immediate makeovers, it will cost you much less time than a complete overhaul of the layout and fixtures of your bathroom.
Whether you want to do minor fixes or a complete overhaul, here are three things you should keep in mind.
Fixture Replacement
Repairing or replacing faulty faucets, fixtures, and toilets usually takes 24 hours. However, if the plumbing or electrical systems are not intact, things might take 2 or 3 days to be functional. If you want to relocate the shower or bathtubs or go for new infrastructure, assign at least 2 days for the task.
Nonetheless, it’s best if you consult a professional bathroom remodeling company before going for a full scale change.
Bathroom Expansion
If you want to expand bathroom space for your growing family, chances are you’ll borrow space from an additional room or convert an unused room into a fully renovated bathroom. In this case, expect additional days for the renovation timeline. Usually, bathroom expansion options take around two to four days.
Flooring installation
Sometimes homeowners go for a radiant-heat subfloor or a wholly waterproof floor, whatever the case may be—the time required to complete the bathroom floor installation directly depends on the number of tile pieces needed. For example, Vinyl flooring takes around one day to finish and tile or wood flooring would take around two to three days to finish.
Bathroom size
The size of the bathroom influences the time it requires to remodel it. Generally, a small bathroom that is remodeled without demolition or plumbing rerouting would take around 7 working days. Similarly, a larger bathroom requires around four to eight weeks to remodel based on the requirements.
Bathroom size
Demolition refers to the removal of existing fixtures and preparation of the required space for modeling. The timeline of demolition for complete bathroom renovation depends on the overall condition of the bathroom and unforeseen repairs during the process. The process of demolition varies on whether it is cosmetic or full demolition. Cosmetic demolition, i.e., the removal of an old vanity or toilet should take a few hours. However, full demolition, i.e., the removal of bathtubs and walls should take at least 2 days to finish. The preparation and installation of tiles is the most tedious task which may take up to 10 days to fully complete.
For bathtub and shower installation in Raleigh, Visit here.
Plumbing and electrical work
We suggest inspecting the entire bathroom for plumbing and electrical work, such as relocating fixtures and changing the electrical layout. Plumbing and electrical work may take around 4 days or over depending on the availability of the contractors and professionals.
Customization and design aesthetics
Some homeowners go for custom features and intricate tile work with design elements that speak of their own style. Therefore, custom orders take longer lead times to finish, and similarly, the cost of bathroom customization and design complexity is also higher.
Material and fixture availability
At times, the availability of materials, including tiles, countertops, and fixtures affects the timeline of bathroom remodeling.
Climatic and seasonal changes
During peak seasons, such as spring and summer, the lead times for scheduling and completing the bathroom remodel may be largely affected.
Pro tip: Plan and project your bathroom remodel during less busy times to expedite the process.
Here’s a step-by-step comprehensive breakdown of the timeline for a complete bathroom remodel.
The planning phase (1 to 4 weeks)
In the planning phase, clients and contractors set their objectives and goals for the revamp, such as updating fixtures, ensuring proper functionality and enhancing design aesthetics, including budget setting for materials, labor, and other expenses.
The initial stage also involves proper research and inspiration for new designs using magazines, brochures, websites, and showrooms. Lastly, to schedule everything with a contractor and designer, we delve into stage two, which is the design phase.
The design phase (2 to 6 weeks)
After finalizing the inspiration designs, it’s time to work with a designer for a conceptual design of your bathroom, such as fixtures, finishes, layout, and color scheme. The design phase also involves selecting the materials, such as tiles, countertops, and cabinetry according to the budget and availability.
The pre-construction phase (1 to 2 weeks)
Before the construction process, it’s vital to place orders for materials and fixtures beforehand to ensure timely delivery and availability. Existing fixtures and cabinets are also removed during the pre-construction phase.
The construction phase (4 to 8 weeks)
The construction phase is the biggest and the most important phase. Most of the technical work is done during this phase, including relocating or installing new fixtures, wiring, and ductwork, etc.The proper installation of fixtures and finishes are also done, including sinks, toilets, showers and bathtubs along with the installation of tiles for walls, floor, and shower surrounds with proper waterproofing and grouting. After the technical nitty gritty, painting the ceilings and installing other bathroom accessories, such as mirrors, towel bars, and hardware is done.
Post construction phase (1 to 2 weeks)
After construction and proper tile installation, caulking, sealing, and other adjusting is done to ensure proper working and functionality.
Completion (1 week)
The final review of completed work and clean-up is done in your newly remodeled bathroom aimed at your comfort and functionality.
Absolutely! Especially if it’s outdated and non-functional and leaks through the ceiling.
Property value
Bathroom remodeling increases the value of your property. If you’re looking to sell your house in Raleigh, NC, for more than the probate value, bathroom remodeling should be your first priority.A recent research by Zillow shows a staggering $1.71 increase in home value for every dollar spent. Nonetheless, keeping up with the trend and upgrading your old bathroom into a fully functional bathroom gives your place an oomph factor that increases your property’s value tenfold.
Plumbing issues
Bathroom remodeling prevents plumbing problems, including mold, mildew, leaks, clogs, and much more. Therefore, it’s crucial to regularly check your bathroom and plumbing system and consult a professional company if you notice any signs of trouble.
Functionality and expansion
If you have limited storage with a nonfunctional layout, bathroom remodeling allows you to expand your bathroom and maximize the space. By tweaking the non-functional spaces in your current bathroom in the most cost-effective manner, bathroom remodeling gives you the means to enjoy luxury at its fullest.
Bathroom remodeling is a tiring process on both; the client’s and the contractor’s end. And it requires patience to reap fruitful results. But honestly, sometimes, the whole process becomes long-winded. As a client, you cannot control the timeline of the overall bathroom remodel, but you have the power to streamline the process in the following ways:
Make timely payments
Avoid letting your contractors hang on to payments for too long because they need to pay the labor.
Return calls and messages
Always be available on your phone and return every call, email, and message of your contractor. Cater to their questions and suggestions patiently.
Make definitive decisions
Avoid unnecessary changes and stick to your original idea to avoid the inconvenience.
FAQs
How long does a bathroom remodel take on average?
The timeline for a complete bathroom remodel depends on various factors such as the scope of the project, bathroom size, customization or availability of labor. However, it is roughly estimated that it takes from 4 weeks to 12 weeks to remodel a bathroom from scratch.
How much does a bathroom remodel cost in 2024?
The cost of a complete bathroom makeover depends on several factors. On average, it costs over $10,000 to remodel a bathroom from start to finish.
Can I remodel my bathroom myself or should I hire a professional?
It’s completely okay to tackle small DIY bathroom projects. For example painting or replacing bathroom accessories. However, it takes professional and licensed contractors to ensure the functionality and working of the remodeled bathroom.
How can I maximize space in a small bathroom?
The only thing you can do to maximize space in a small bathroom is to clear clutter. Also, install space-saving fixtures, including wall-mounted mirrors, toilets and floating vanities.Go for light color tiles and reflective surfaces to create an illusion of space.
How long does it take to remodel a small bathroom?
Remodeling a small bathroom is a wise decision because it not only ensures functionality but also enhances the aesthetics of a compact place. On average, it may take around 23 to 25 days to remodel a small bathroom.
So, now you know the answer to, “How long does a bathroom remodel take place”. Even though the answer is quite subjective, keep at least 6 weeks in mind for a full bathroom makeover. Sometimes, all a bathroom needs is quick repair of fixtures and tiles. However, with a complete bathroom renovation, things are quite different. For example, If your bathroom’s fixtures and design are outdated, it’s high time to get a professional bathroom remodel to modernize the look and functionality. If you’re looking for superior services in the Raleigh, NC region, MDA remodeling is your best bet. Moreover, if you’re looking for lighting and ventilation upgrades in the Chapel Hill area, you can contact us here. We believe in smooth communication and transparency for the success of our projects. Consult with us for comprehensive information and detailed pricing guides for your home renovation project. We offer different pricing based on your individual needs for bathroom remodeling in Raleigh, NC. Along with bathroom remodeling, we also offer kitchen remodeling and exterior renovation in Raleigh, NC & surrounding areas.Ready to elevate your lifestyle with a fully functional and improved bathroom? Call us today for a FREE quote or fill out the form now. For more tips and knowledge based information related to your home, bathroom, and outdoor space, read our blog here.